Fire Alarm Maintenance Log. Organization of maintenance and repair. Fire alarm installation
JOURNAL
TROUBLESHOOTING INSTRUCTIONS FOR FIRE AUTOMATION
Installation type ___________________________________________________________________ Installation date __________________________________________________________ Protected object ______________________________________________________________
Date and time of failure of the element or its component | Character- manifest external manifest failures | The reason for the failure is nosti (failure), the number of hours of operation of the failed element | Taking measures to fault spare parts, spare parts | Signature eliminating the fault | Note |
|
APPENDIX 34
PRIMARY EXAMINATION OF AUTOMATIC FIRE EXTINGUISHING INSTALLATIONS, FIRE ALARMS
________________________ "____" _____________ 19___ d. We, the undersigned: customer representative ________________________________________________________________________________
(name of the enterprise, organization, institution)
In the person of __________________________________________________________________________
On the one hand, and the representative of the contractor, ________________________________________________________________________________
(position, surname, initials)
On the other hand, they compiled this act in that when examining the installations ________________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________
(list installation)
_________________________________________________________________________________ Mounted _________________________________________________________________(name of installation company,
________________________________________________________________________________installation date)
According to the project implemented _________________________________________________________ ________________________________________________________________________________
(name of the design organization,
________________________________________________________________________________project release number and date)
Well-established _____________________________________________________________________ ________________________________________________________________________________
(name of the setup organization, setup date)
Installed: technical condition of the installations ___________________________________________________ ________________________________________________________________________________
(indicate faults)
________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________ design and technical documentation, acts ________________________________________________________________________________(indicate the missing documentation, give comments on the available)
Conclusions and suggestionsAPPENDIX 35
ON PERFORMED WORKS ON THE PRIMARY SURVEY OF AUTOMATIC FIRE EXTINGUISHING INSTALLATIONS, FIRE ALARMS
"____" _____________19
________________________________________________________________________________(contractor, his bank details)
________________________________________________________________________________(customer, his bank details)
Name of installations, their technical means | Price list item number | Unit price | total cost |
|
total amount
APPENDIX 36
PASSPORT
AUTOMATIC FIRE EXTINGUISHING INSTALLATIONS, FIRE ALARMS
1. GENERAL INFORMATION Name of the enterprise (organization) -customer details ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________
Name of the protected object | type of instalation | Name of organization that completed the project, project number, project release date | Name of organization that performed installation and commissioning, date of commissioning |
Installation number | number | Year of issue |
|
Conditions maintenance
The number of detectors (sprinklers) installed at a height, m: 5-8 ____________________________________________________________________________ 8-15 ___________________________________________________________________________ above 15 ________________________________________________________________________ Height-lifting equipment (hoisting vehicles) ________________________________________________________________________________ Category of protected premises for electrical safety ________________________________________________________________________________ Other information _________________________________________________________________ 3. INFORMATION ABOUT ADDITIONS) INSTALLATIONS
Installation number | Name of the replaced unit, vehicle, element | Justification |
|
APPENDIX 37
FIRST JOURNAL SHEET
________________________________________________________________________________(executing enterprise)
________________________________________________________________________________(plot, workshop)
MAGAZINE No. _______
registration of maintenance and repair work automatic installations fire fighting fire alarm
________________________________________________________________________________(Object name)
Started "____" ____________ 19___
Finished "____" ___________ 19___
SECOND JOURNAL SHEET
1. Name of the object and its location (address, phone) ________________________________________________________________________________ 2. List of settings ____________________________________________________________ ________________________________________________________________________________________________________________________________________________________________ 3. Contract number, date of conclusion _____________________________________________ 4. Annual cost of work ________________________________________________________ 5. Bank details of the customer _________________________________________________ 6. Bank details of the contractor ______________________________________________ 7. , surname, name, patronymic of the person responsible for operation of the installation (s) and sample of its signature _______________________________________________________________________________________________________________________________________________________________________________ 8. Number of the order and the date the customer was appointed for the operation of the installation (s) _______________________________________________________________________________ 9. Position, surname, name, patronymic of persons performing maintenance ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __________________________________________ Note. The journal numbered and laced ___ sheets.
APPENDIX 38
SCHEDULE
MAINTENANCE AND REPAIR ON 19___
_______________________________________ BY CONTRACT No. _________
(Object name) ____________________________________________________________________________
I quarter | II quarter | III quarter | IV quarter |
||||||||||
Type set wok, vehicle, nodes | Type of work (external inspection, verification of work- news, prof | ||||||||||||
Contractor "____" _______________ 19 __ .__________________________ Operation and maintenance of fire alarms at the facilityMonitoring compliance with safety standards, rules and requirements for the operation of ASASGuidelines (MR) VNIIPO Ministry of Internal Affairs of the Russian Federation “Automatic fire extinguishing systems and fire alarms. Acceptance and control rules ”regulate the control of the implementation of design decisions upon acceptance of the ASPS and AUP into operation, the procedure for their maintenance and repair (MRO). General Provisions Responsibility for the organization of the operation of ASAS is assigned to the heads of facilities that are protected by fire automatics. Requirements for operational technical documentation for ASAS. For each ASPS, an order or instruction p on the enterprise (organization) shall be issued, appointing: Operational (duty) personnel should have and fill out the “Installation Failure Log”. The control room should contain instructions on the procedure for the duty dispatcher on receipt of alarm signals. ASA Operational Documentation ASA Fault Log Type of instalation ________________________________________________ Installation Installation Date _______________________________________ Protected object __________________________________________ Act of initial inspection of a fire automatics installation (form) G .____________ "___" ____________ 200__ We, the undersigned: Customer representative ___________________________________________________________________________ In the person of ___ (posts last name, initials) On the one hand, and the representative of the contractor ________________________________________________________ On the other hand, they compiled the present act in the fact that during the inspection of installations __ Mounted __________________________________________________________________________________ But the project completed _______________________________________________________________________ Well-established ______________________________________________________________________________________ INSTALLED: Technical condition of installations _________________________________________________________________ Design and technical documentation, acts ______________________________________________________ ___________ Conclusions, suggestions ___________________________________________________________________________ Customer executive
____________________________________
______________________________________ M.p. m.p. Chairman of the installation and commissioning organization _________________________________________________ Act on the initial inspection of automatic fire alarm systems "__" _________ 200__g.
_______________________________________________________________________________________________
_______________________________________________________________________________________________ Customer executive______________________________ "___" ____________________ 200_ "___" _____________________ 200_g. M.p. m.p. Passport of automatic fire alarm systems I. GENERAL INFORMATION Name of the enterprise (organization) -customer, details:
_____________________________________________________________________________________________ 2. COMPOSITION OF THE INSTALLATION Maintenance Terms The number of detectors. installed at height, m: 5-8…………………………………………………………. 8 - 15……………………………………………………….. Above 15 ……………………………………………………… .. Lifting equipment at a height (trucks) ______________________________ Other information ___________________________________________________________________________ 3. INFORMATION ON REPLACEMENT (ADDITIONS) OF THE INSTALLATION Passport compiled
_________________________________________________________________________________________ Agreed
________________________________________________________________________________________ "___" _________________ 200__ Agreed
_______________________________________________________________________________________ "___" _________________ 200__ Technical requirements that determine the performance of ASAS 1. Type of installation _______________________________________________________________________ 2. Installation composition ____________________________________________________________________ 3. Integrated installation verification Technical requirements developed
________________________________________________________________________________________ Agreed Agreed Contractor Customer
_______________________________________
____________________________________________ "___" _________________ 20 ___ g. "___" _________________ 200_y. Note. The list of vehicles included in the installation and subject to maintenance and P: Schedule for maintenance and repair for 200__
________________________________________________________________________________________ Contractor Customer
_______________________________________
____________________________________________ "___" _________________ 20 ___ g. "___" _________________ 200_y. Standard Maintenance Schedule automatic systems fire alarm Log book for maintenance and P automatic fire alarm systems
_____________________________________________________________________________________
_____________________________________________________________________________________ JOURNAL №. Started "___" _______________ 200_ Completed "___" _______________ 200_ SECOND JOURNAL SHEET I. Name of the facility and its location (address, telephone): ____________________________________________________________________________________ 2. List of settings ____________________________________________________________________________________ 3. The number of the contract, the date of its conclusion _____________________________________________ 4. The annual cost of work _________________________________________________________ 5. Bank details of the customer __________________________________________________ 6. Bank details of the contractor _______________________________________________ 7. Position, surname, name, patronymic of the installation responsible (installations) and a sample of its signature __________________________________________________ 8. The number of the order and the date by which the responsible person of the customer is assigned For the operation of the installation (s) ______________________________________________ 9. Position, surname, name, patronymic of persons performing technical Service_____________________________________________________________________ Note. The journal numbered and laced _____ sheets. GOST R 50776 requirements for operation and maintenance of systems General Provisions Maintenance of the system, the complex should be carried out periodically, in the prescribed form. Organization of maintenance and repair Maintenance. The main tasks of maintenance are: Maintenance can be scheduled (regulated) or unplanned (according to technical condition). Unscheduled maintenance is carried out at: Repair of hardware burglar alarm. Current repair of alarm loops consists in replacing individual failed components (detectors, installation elements, sections of connecting lines). Personnel actions in the event of an alarm Actions of the facility personnel on alarms (8) of the system, complex should be regulated by special instructions, agreed with the security services of the facility. Instructions should include information on how personnel should respond, what actions to take, what communications to use, etc. Response service. The interaction of services that ensure the protection of the facility. Users of the system, complex (owners of the protected facility) must have constant communication with organizations and services that ensure the protection of the facility and the trouble-free operation of the technical facilities of the system and complex. Registration of service information of the system (complex) Any system, complex should have a means of recording service information (for example, automatic documentation, magazines). Passport system, complex. When drawing up diagrams, it is necessary to apply legend, abbreviations with confidentiality. Chronology. When operating the system, the complex, it is necessary to record and time the functioning results with the reasons for the appearance of various service signals (“alarm”, “failure”, etc.). Registration of technical inspections ( routine maintenance). During the operation of the system, the complex should be registered and recorded maintenance work (routine maintenance). Records, including timing and the provisions of section 9. as well as identified deficiencies and actions to address them must be kept in a special document (journal). Registration of alarms. Registration of alarms issued by the system, the complex, must be in the form of records containing: the date and time of receipt of the alarm, the type of signal, the place of its occurrence; timing of signal response activities. Registration of cases of shutdown of the system, complex ("removal" of the facility with protection by technical means). Registration of cases of shutdown of the system, the complex as a whole or its individual fragments should be in the form of records containing: the date and time of the shutdown, an indication of the specific technical means that caused the shutdown and the reason for this, the date and time of the re-inclusion. registration of maintenance and repair work automatic____________________________________________ object name Started "___" ____________________ 19 ___ Ended on "___" ___________________ 19 ___ The second sheet of the magazine1. The name of the object and its location (address, telephone) _______________________ 2. List of settings _____________ _______________________________________________________________________________ _______________________________________________________________________________ 3. The number of the contract, the date of its conclusion _____________________________________________ 4. The annual cost of work _______________________________________________________ 5. Bank details of the Customer _________________________________________________ 6. Bank details of the Contractor ______________________________________________ 7. Position, surname, name, patronymic of the person responsible for the operation of the installation (s) and a sample of his signature __________________ 8. The number and date of the order, which is assigned the responsible person of the Customer for the operation of the installation (s) _____________________________ 9. Position, surname, name, patronymic of the Contractor's persons performing maintenance _____________________________________________________________________ _______________________________________________________________________________ Note: _____________ sheets are numbered and laced in the journal The third sheet of the magazineConducting periodic briefing of the Contractor’s personnel by the Customer’s responsible person Subsequent Journal Sheets
APPENDIX 7Schedulemaintenance and repair on 19 ______________________________________ under contract No. _____________object name
M.P. Performer M.P. Customer "___" ___________________ 19 __ g. "___" _________________ 19 __ g. _______________________________ _____________________________ APPENDIX 8Mandatory Contract No. ___ of "___" _________ Calculation of the annual cost of workfor maintenance and repair of automaticfire extinguishing installations, smoke removal, security,fire and fire alarm
Total Installation Total contract M.P. Customer M.P. Performer "___" _________________ 19 __ g. "___" _________________ 19 __ g. _____________________________ ______________________________ Name, signature Name, signature APPENDIX 9TO CONTRACT No.from "___" _____________ 19 __ Technical requirementsThe defining health parameters of automaticfire extinguishing installations, smoke removal, security,fire and fire alarm1. Type of installation __________________________________________________________ 2. Installation composition
3. Integrated installation verification
Technical requirements developed ______________________________________________________________ position, full name, signature, date Agreed Agreed Contractor Customer job title M.P. M.P.___________________________________ ________________________________ Name, signature Name, signature "_____" _____________________ 19 __ g. "_____" _________________ 19 __ g. APPENDIX 10Reference ScrollVehicle included in the installation and subject to maintenanceand repair by the Contractor1. Automatic fire extinguishing installations 1.1. Water (foam) fire extinguishing installations: pumping units, distribution pipelines with sprinklers, induction systems, control units. Shut-off and control valves (gate valves, valves, check valves), tanks (hydropneumatic tank, containers for storing foam solution, foaming agent, filling pumps), dispensers, compressor, sirens, electrical equipment (control and management), fire detection equipment. 1.2. Gas extinguishing installations: distribution pipelines, with nozzles, incentive systems, batteries, typesetting sections, incentive-starting sections, air distributors, distribution devices, cylinder receiver, charging station, sirens, electroautomatics (control and management), fire detection equipment. 1.3. Powder fire extinguishing installations: distribution pipelines with nozzles. Cylinders with compressed air. Container with powder composition. Annunciators, electroautomatics (control and management), technical means of fire detection. 2. Installations of security, fire and fire alarm: control panels, loops with detectors, intermediate devices, terminals, sirens. APPENDIX 11Mandatory Magazine Cover Form__________________________________ contractor __________________________________ __________________________________ town _____________________________ Call logStarted ____________________________ day month Year Finished __________________________ day month Year Magazine sheet form
More on the topic |